Start Date:

12/10/2019 6:06 PM

End Date:

12/10/2019 9:06 PM

Description:

The scene has been cleared and train movement has resumed.

Brunswick Line Train 893 (5:20 dpt Wash) is operating with a 75-80 minute delay.

Brunswick Line Train 879 (5:40 dpt Wash) is operating with a 60-65 minute delay.

Brunswick Line Train 881 (6:20 dpt Wash) is operating with a 20-25 minute delay.

Brunswick Line Train 895 (6:40 dpt Wash) is operating with a 10-15 minute delay.

Residual delays of 10-15 minutes are expected as rail traffic clears.

Affected Routes:

  • MARC: BRUNSWICK - WASHINGTON

Cause:

Other Cause

Effect:

Other Effect