Start Date:

07/09/2024 4:30 PM

End Date:

07/09/2024 7:30 PM

Description:

North bound Penn Line trains are back on the move and residual delays are expected. Current delays are as follows:

-Train 532 (4:10p Dpt. WAS) is operating with a 45-50 minute delay.
-Train 430 (4:20p Dpt. WAS) is operating with a 50-55 minute delay.
-Train 428 (4:30p Dpt. WAS) has departed and is operating with a 50-55 minute delay.
-Train 634 (4:50p Dpt. WAS) has departed and is operating with a 40-45 minute delay.
-Train 536 (5:18p Dpt. WAS) has departed and is operating with a 15-20 minute delay.
-Train 438 (5:20p Dpt. WAS) has departed and is operating with a 15-20 minute delay.
-Train 440 (5:35p Dpt. WAS) has departed and is operating with a 10-15 minute delay.


Updates to follow as they become available.

Affected Routes:

  • MARC: PENN - WASHINGTON

Cause:

Other Cause

Effect:

Other Effect